Home Agencies DOE

Agencies · DOE

DOE CUI protection, engineered to the order — and to your contract.

DOE O 470.7 and existing incorporated directives must be read alongside your DOE contract and flow-downs. We map the actual CUI safeguards and UCNI handling requirements before designing the boundary.

Reviewed October 6, 2026: DOE O 470.7, approved August 5, 2026, supersedes O 471.7 for its covered facilities and activities. Existing contractor requirements remain effective until formally changed. Determine the CUI safeguards, applicable NIST revision, and UCNI requirements from your contract and current DOE direction.

What the DOE lane involves

Questions contractors ask us

Which DOE requirements apply to our contract?

DOE O 470.7 supersedes O 471.7 for covered facilities and activities, but existing contractor requirements remain effective until formally changed. Review the order, your contract and flow-downs, and current agency direction to establish CUI safeguards and the applicable NIST revision.

Is UCNI the same as CUI?

No. Unclassified Controlled Nuclear Information is its own statutory control regime with its own access and handling rules; under the CUI program it's handled as a specified category with requirements beyond the CUI baseline. If your DOE work touches UCNI, the boundary and handling design must respect those specific rules — not just the generic CUI baseline.

We support a national laboratory as a subcontractor. Who imposes the requirements?

Your prime's flow-downs, which trace back to the lab's M&O contract and DOE directives. Practically, that means reading the flow-down clauses you actually received — primes sometimes flow more, or less, than the directive strictly requires, and your obligation is what's in your subcontract.

DOE lane

Get the DOE obligation mapped before it maps you.

Tell us the contract type — direct award, lab subcontract, financial assistance — and a practitioner will identify what actually applies and how to satisfy it. Or email rj@indirectit.com directly.